Read the following passage and select the most appropriate answer.
A construction company is building a pre-fabricated structure, which requires specialized crane operators for five different parts of the job. 6 operators are available R, S, T, U, V and W and each phase will take one day and will be done by a single operator. Though an operator may do more than one phase of the job, no operator will work 2 days in a row.
♦ Both R and S can handle any phase of the job.
♦ T can work only on days immediately following days on which S has worked.
♦ U can work only the days that T can.
♦ V can only work on the 3rd and 5th day of the job.
♦ W can only work on the 4th day of the job.
If S works on the 1st day of the job, which of the following are true?
I. Only T or U can work on the 2nd day
II. T,U or R could work on the 2nd day
III. R,S or W could work on the 3rd day
I only
II only
III only
I and III only
I,II and III
Loading....
Loading....
Loading....
Share our page
Looking for job. Try JobLoader- First ever job search engine in Bangladesh. All open bd jobs now a single mouse click away.
Contact us | Terms and conditions| About | Privacy policy
Copyright © 2023· All Rights Reserved· ReadBD